Road Lighting System and Tollaplaza Lighting

Location: Chaibasa-Kandra-Chowka -Jharkhand

Client : M/s GKC Project Limited .

End User : M/s JARDCL Jharkhand

Project Period : 01-10-2016 to 31-03-17.
Project Value : 1.05 Cr.
In FY 2016-2017 , One of the prestigious High Value Project executed by Rayglow Team.

3 KVA Solar Power Generating System for Residential Purpose

Client : Mr.Shri Harsha Akkadka

Project Date: 25/11/2017.

Project Cost : 1.6 lakhs.

High Mast Lighting System and Road Lighting System for NHAI

Supply Installation Testing and Commissioning of 20M High mast Lighting system and Road Lighting System for NHAI AndraPradesh.

High Mast Lighting System and Road Lighting System for Jharkhand

Supply Installation Testing and Commissioning of 30M High mast Lighting system and Road Lighting System for Jharkhand Road development corporation Ltd Jharkhand.

Solar Street Lighting System for M/s Jharkhand Road Development

Supply Installation Testing and Commissioning of 30W Solar street Lighting system for M/s Jharkhand Road development corporation Ltd Jharkhand.

Solar Hybrid Inverter at M/s Madhu multiples Mali Puttur

Supply Installation Testing and Commissioning of 3KVA X 1 No Solar Hybrid Inverter at M/s Madhu multiples Mali Puttur.

Solar Hybrid Inverter at Kolthige PACS Ltd

Supply Installation Testing and Commissioning of 3KVA X 2 Nos Solar Hybrid Inverter at Kolthige  PACS Ltd Perlampady.

solar power heading 5

Supply and Installation of Off-Grid Solar Inverters / UPS

We supply and install off-grid solar inverters / UPS for banks, school, residence, petrol bunks, hospitals and other institutions. We supply four major parts along with the minor parts which form off-grid solar inverters namely; home / business AC power loads, utility supply, battery bank and solar array. Our usual installation procedure is as follows –

  • Our expert engineers calculate the loads that a client needs to draw from the inverter like AC outlets, washing machines, lights, electrical kitchen gadgets, electronic goods etc.
  • Now they attach a sub-panel to the main panel.
  • Then the desired circuits are connected to the sub-panel from main panel.
  • In order to deliver AC to the inverter’s AC input, a proper circuit breaker is installed in the main AC panel.
  • In the last step, inverter’s AC output is connected to the sub-panel output through wires.